Cantilever Formwork System
Detailed Product Description
Cantilever formwork system is divided into XB-180 and XB-240. Apply condition: the space between the two cantilevers is less than 4 meters in the cantilever formwork unit.
XB-240 formwork can be moved back to 700mm, and XB-180 formwork can be to 450mm. This will provide working space for cleaning formwork and fixing reinforcing steel.
The formwork can be used flexibly by adjusting its bracket or brace. And the formwork can be inclined to 30°by adjusting the main bracket and brace adjustment.
Panels are connected with BaiLi coupler, short waler or connecting plate is adopted in some parts to ensure the flatness between panels.
The embedded anchor carries all the concrete pressure, ensuring a good surface effect. No tie rod is needed here.
High standardization, strong generality and quick operation. Low cost and high durability.
Cantilever formwork System is mostly used in the construction like dam, bridge pier, concrete retaining wall, cooling tower, etc .
Cantilever Formwork System
Products
- Accessories [9]
- Roll Forming [1]
- Formwork System [12]
- Scaffolding Series [4]
- Profile [2]
Company Info
China Construction-Baili Engineering Technology Development Co., Ltd.
[China (Mainland)]
[Verified Member]
Province/State: Beijing
Country/Region : China (Mainland)
Business Type:Manufacturer
Online Postings: Products

















